Place of Origin: | Zhejiang, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Auto parts prototype injection molding 20 days mold manufacturing lead time
Part Name | Plastic Material | tooling life | Cavity | Cavity/Core | Mold standard | Mold type | Remarks |
AB10394/95/96 | TPS | 2000 shots | 1+1+1 | P20 | LKM | 2 plates | 1050 AB plate |
Where we win :
Mold type |
Plastic injection mould, Die casting mould |
Mold type of cycle life |
Test mould, Prototype mould, Production mould |
Design software |
Auto CAD, UG, Pro-e, Solid work etc |
Mold base |
LKM, DME, HASCO etc. |
Steel |
718H, P20, NAK80, SKD61Heat hard, H13 Heat hard , S136 heat hard, 420(heat hard) 8407(heat hard), Cr12, CrWMn ,etc. |
Runner type: |
cold runner, hot runner |
Cavity type |
single, family, multi-cavity |
Hot runner |
YUDO, Mold master, Incoe, Huskey etc |
Standard mold part |
DME, HASCO, DAIDO, RABOURDIN etc |
Surface treatment |
Polished, Mold Tech, Nihong, YickSang etc |
Package |
Free check wooden box |
Shipping |
by sea, by air, by express etc(as per customer’s request) |
With the help ofCMM, projector, and some othermeasuring tools and equipments and team members conscientiousness,we can guarantee the mold quality by inspecting in-coming material ,manufacturing process and samples.
Our main QC Process are as follows :
1. Customer’s Mold Specification Sheet Check
2. Mold Design Control
3. Mold Steel Hardness Inspection
4. Mold Electrodes Inspection
5. Mold Core and Cavity Steel Dimension Inspection
6. MoldPre-Assembly Inspection
7. Mold Trial Report and Samples Inspection
8. Final Full Inspection prior to shipment
9. Mold Package Inspection
Hitop industrial (HK) co., Ltd [China (Mainland)]
Business Type:Manufacturer
City: Dongguan
Province/State: Guangdong
Country/Region: China (Mainland)